• Caption: East portal of the Forest/Zumbiel tunnel for the never completed subway in Norwood, looking northwest from the baseball field at Waterworks Park. Again, the north tunnel has been sealed off with concrete, but the south tunnel is still open. Some temporary lighting can be seen on the left side of the tunnel, where sewer and/or water line work is going on. The tunnel curves gently to the left, so it's not possible to see to the other side.
  • Date: 2/14/2004, 12:44:12 PM EST
  • File Name: DSCN5731.JPG